Triple

T22445850
Position Surface form Disambiguated ID Type / Status
Subject Dart DevTools E554860 entity
Predicate instanceOf P0 FINISHED
Object Flutter development tool C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Flutter development tool
Context triple: [Dart DevTools, instanceOf, Flutter development tool]
  • A. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • B. cross-platform development framework
    A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
  • C. front-end build tool
    A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
  • D. collection of programming tools
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • E. .NET development platform component
    A .NET development platform component is a modular building block—such as a library, runtime, or tooling element—that integrates into the .NET ecosystem to provide specific functionality for building, running, or managing .NET applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e5113208190ab58c6b595f9d1d0 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:47 p.m.