Triple
T22382160
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hudson–Bergen Light Rail tunnels |
E553300
|
entity |
| Predicate | isPartOfCorridor |
P35
|
FINISHED |
| Object |
Hudson River waterfront transit corridor
The Hudson River waterfront transit corridor is a major urban transportation axis along New Jersey’s Hudson River shoreline, integrating light rail, buses, ferries, and other modes to connect waterfront communities with regional job and activity centers.
|
E1534430
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hudson River waterfront transit corridor | Statement: [Hudson–Bergen Light Rail tunnels, isPartOfCorridor, Hudson River waterfront transit corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hudson River waterfront transit corridor Context triple: [Hudson–Bergen Light Rail tunnels, isPartOfCorridor, Hudson River waterfront transit corridor]
-
A.
Staten Island South Shore transit corridor
The Staten Island South Shore transit corridor is a key transportation route on Staten Island that serves as a major spine for local and express bus services connecting South Shore neighborhoods to the rest of New York City.
-
B.
Manhattan Waterfront Greenway
The Manhattan Waterfront Greenway is a continuous 32-mile shared-use path encircling Manhattan, providing cyclists and pedestrians with scenic access to the island’s riverside parks and shoreline.
-
C.
Staten Island–Manhattan corridor
The Staten Island–Manhattan corridor is a key travel and commuting route linking Staten Island with Manhattan across New York Harbor.
-
D.
Hudson River travel corridor
The Hudson River travel corridor is a major north–south transportation route in eastern New York State that follows the Hudson River and integrates highways, rail lines, and other infrastructure connecting New York City with upstate communities.
-
E.
Hudson River crossing network
The Hudson River crossing network is the system of bridges, tunnels, and related infrastructure that connect communities across the Hudson River in New York and New Jersey.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Hudson River waterfront transit corridor Triple: [Hudson–Bergen Light Rail tunnels, isPartOfCorridor, Hudson River waterfront transit corridor]
Generated description
The Hudson River waterfront transit corridor is a major urban transportation axis along New Jersey’s Hudson River shoreline, integrating light rail, buses, ferries, and other modes to connect waterfront communities with regional job and activity centers.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Hudson River waterfront transit corridor Target entity description: The Hudson River waterfront transit corridor is a major urban transportation axis along New Jersey’s Hudson River shoreline, integrating light rail, buses, ferries, and other modes to connect waterfront communities with regional job and activity centers.
-
A.
Staten Island South Shore transit corridor
The Staten Island South Shore transit corridor is a key transportation route on Staten Island that serves as a major spine for local and express bus services connecting South Shore neighborhoods to the rest of New York City.
-
B.
Manhattan Waterfront Greenway
The Manhattan Waterfront Greenway is a continuous 32-mile shared-use path encircling Manhattan, providing cyclists and pedestrians with scenic access to the island’s riverside parks and shoreline.
-
C.
Staten Island–Manhattan corridor
The Staten Island–Manhattan corridor is a key travel and commuting route linking Staten Island with Manhattan across New York Harbor.
-
D.
Hudson River travel corridor
The Hudson River travel corridor is a major north–south transportation route in eastern New York State that follows the Hudson River and integrates highways, rail lines, and other infrastructure connecting New York City with upstate communities.
-
E.
Hudson River crossing network
The Hudson River crossing network is the system of bridges, tunnels, and related infrastructure that connect communities across the Hudson River in New York and New Jersey.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4c03248190a26a5060ea6973ee |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f1582cce608190b5324b30f349a3ff |
completed | April 29, 2026, 1 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0ae9b5fccc8190acc5ea778e19f7d5 |
completed | May 18, 2026, 10:28 a.m. |
| NEDg | Description generation | batch_6a0aeabb52008190b62e3a83dbc3419b |
completed | May 18, 2026, 10:32 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a0aeb6252248190a7cb0df06afd4db2 |
completed | May 18, 2026, 10:35 a.m. |
Created at: April 16, 2026, 8:45 p.m.