Triple

T22362112
Position Surface form Disambiguated ID Type / Status
Subject Mississippi Highway Patrol E552802 entity
Predicate headquartersLocation P62 FINISHED
Object Jackson, Mississippi E10442 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jackson, Mississippi | Statement: [Mississippi Highway Patrol, headquartersLocation, Jackson, Mississippi]

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4affcc8190ba7c27d29062558d completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f157d44a908190b16e4cfdf4591b10 completed April 29, 2026, 12:59 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0fee3d94748190a6efd95f0ed16de5 completed May 22, 2026, 5:48 a.m.
Created at: April 16, 2026, 8:44 p.m.