Triple
T22221970
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Route 1 Wimbledon – Elmers End |
E549232
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | London Tramlink route |
C45972
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: London Tramlink route Context triple: [Route 1 Wimbledon – Elmers End, instanceOf, London Tramlink route]
-
A.
Sheffield Supertram route
A Sheffield Supertram route is a defined public transport service path within the Sheffield light rail network, specifying the sequence of stops, track segments, and operational patterns followed by trams between termini.
-
B.
trolleybus line
A trolleybus line is a designated public transit route served by electrically powered buses that draw current from overhead wires along the roadway.
-
C.
Docklands Light Railway branch
A Docklands Light Railway branch is a secondary route that diverges from the main DLR network to serve specific areas or destinations within London’s Docklands and surrounding districts.
-
D.
London Underground depot
A London Underground depot is a specialized facility where Underground trains are stored, maintained, cleaned, and prepared for daily service on the network.
-
E.
London Underground precursor
A London Underground precursor is any early urban rail or transport system, proposal, or technological development that directly influenced or led to the creation of the London Underground.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e403d6481909a94d0aaf157f6ef |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:37 p.m.