Triple

T21989715
Position Surface form Disambiguated ID Type / Status
Subject JIS TR X 0029 E543050 entity
Predicate instanceOf P0 FINISHED
Object Japanese Industrial Standards technical report C1078 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Japanese Industrial Standards technical report
Context triple: [JIS TR X 0029, instanceOf, Japanese Industrial Standards technical report]
  • A. technical report chosen
    A technical report is a structured document that presents methods, data, analysis, and conclusions about a specific technical or scientific investigation for a targeted audience.
  • B. railway technical standard
    A railway technical standard is a formalized set of specifications and requirements that define the design, construction, operation, and maintenance criteria for railway systems to ensure safety, interoperability, and performance.
  • C. IEC system for conformity testing and certification
    An IEC system for conformity testing and certification is a standardized framework that defines procedures, criteria, and accreditation mechanisms to verify and certify that products, services, or systems comply with relevant IEC international standards.
  • D. ASTM technical committee
    An ASTM technical committee is a group of subject-matter experts organized under ASTM International to develop, review, and maintain voluntary consensus standards within a specific technical or industrial domain.
  • E. DIN standard
    A DIN standard is a formal technical specification developed by the German Institute for Standardization (DIN) that defines uniform criteria, dimensions, methods, or quality requirements for products, processes, and services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c48136b081908831fa907cc02e18 completed April 16, 2026, 11:14 a.m.
Created at: April 16, 2026, 8:05 p.m.