Triple

T21826099
Position Surface form Disambiguated ID Type / Status
Subject Bear Island (North Carolina) E538858 entity
Predicate locatedIn P40 FINISHED
Object Onslow County, North Carolina E124880 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Onslow County, North Carolina | Statement: [Bear Island (North Carolina), locatedIn, Onslow County, North Carolina]

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c475038c8190abb9b1a20eb8ff50 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f09132ae888190b8c1a8e75b96b5fd completed April 28, 2026, 10:51 a.m.
NED1 Entity disambiguation (via context triple) batch_6a2721c7068c8190b5c7456557837b36 completed June 8, 2026, 8:10 p.m.
Created at: April 16, 2026, 6:54 p.m.