Triple

T21558589
Position Surface form Disambiguated ID Type / Status
Subject Endesa Chile E531955 entity
Predicate operatesIn P82 FINISHED
Object SIC (Sistema Interconectado Central) E613392 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SIC (Sistema Interconectado Central) | Statement: [Endesa Chile, operatesIn, SIC (Sistema Interconectado Central)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SIC (Sistema Interconectado Central)
Context triple: [Endesa Chile, operatesIn, SIC (Sistema Interconectado Central)]
  • A. SIC (Sistema Interconectado Central) chosen
    SIC (Sistema Interconectado Central) is Chile’s former main interconnected electric power grid that supplied electricity to the central region of the country, including most of its population and economic activity.
  • B. Colombian National Interconnected System
    The Colombian National Interconnected System is the nationwide electricity grid that integrates Colombia’s power generation, transmission, and distribution infrastructure into a unified network.
  • C. SIC
    SIC is a major Portuguese television network known for its wide range of entertainment, news, and cultural programming.
  • D. Brazilian National Interconnected System
    The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
  • E. Sistema Central
    Sistema Central is a major mountain range in central Spain that forms a natural barrier dividing the northern and southern plateaus of the Iberian Peninsula.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c460232c81908de2c3819d17c00e completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69eed2e21c5c8190aa32795e41f1550e completed April 27, 2026, 3:07 a.m.
NED1 Entity disambiguation (via context triple) batch_6a09eee9792c8190b3365aeaafd03275 completed May 17, 2026, 4:38 p.m.
Created at: April 16, 2026, 6:29 p.m.