Triple

T21542103
Position Surface form Disambiguated ID Type / Status
Subject Georgia State Route E531516 entity
Predicate connectsTo P845 FINISHED
Object Interstate Highway System in Georgia
The Interstate Highway System in Georgia is the network of federally funded, high-speed highways that forms the backbone of long-distance and urban transportation across the state, linking major cities, regions, and neighboring states.
E1490644 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate Highway System in Georgia | Statement: [Georgia State Route, connectsTo, Interstate Highway System in Georgia]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate Highway System in Georgia
Context triple: [Georgia State Route, connectsTo, Interstate Highway System in Georgia]
  • A. East–West Highway of Georgia
    The East–West Highway of Georgia is a major transportation corridor that spans the country, linking key cities and regions and serving as a vital route for domestic travel and international trade.
  • B. Interstate 16 in Georgia
    Interstate 16 in Georgia is an east–west Interstate Highway that connects Macon to Savannah, serving as a major route between central Georgia and the Atlantic coast.
  • C. Interstate Highway System in West Virginia
    The Interstate Highway System in West Virginia is the network of federally designated high-speed highways that forms the backbone of long-distance and regional travel across the state, connecting major cities and linking West Virginia to neighboring states.
  • D. Interstate 85 in Georgia
    Interstate 85 in Georgia is a major north–south Interstate Highway that runs through key cities including Atlanta, serving as a primary transportation corridor in the state and the southeastern United States.
  • E. Interstate Highway System in Oklahoma
    The Interstate Highway System in Oklahoma is the network of federally designated high-speed highways that forms the backbone of long-distance and urban travel across the state, connecting major cities, neighboring states, and key economic corridors.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate Highway System in Georgia
Triple: [Georgia State Route, connectsTo, Interstate Highway System in Georgia]
Generated description
The Interstate Highway System in Georgia is the network of federally funded, high-speed highways that forms the backbone of long-distance and urban transportation across the state, linking major cities, regions, and neighboring states.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate Highway System in Georgia
Target entity description: The Interstate Highway System in Georgia is the network of federally funded, high-speed highways that forms the backbone of long-distance and urban transportation across the state, linking major cities, regions, and neighboring states.
  • A. East–West Highway of Georgia
    The East–West Highway of Georgia is a major transportation corridor that spans the country, linking key cities and regions and serving as a vital route for domestic travel and international trade.
  • B. Interstate 16 in Georgia
    Interstate 16 in Georgia is an east–west Interstate Highway that connects Macon to Savannah, serving as a major route between central Georgia and the Atlantic coast.
  • C. Interstate Highway System in West Virginia
    The Interstate Highway System in West Virginia is the network of federally designated high-speed highways that forms the backbone of long-distance and regional travel across the state, connecting major cities and linking West Virginia to neighboring states.
  • D. Interstate 85 in Georgia
    Interstate 85 in Georgia is a major north–south Interstate Highway that runs through key cities including Atlanta, serving as a primary transportation corridor in the state and the southeastern United States.
  • E. Interstate Highway System in Oklahoma
    The Interstate Highway System in Oklahoma is the network of federally designated high-speed highways that forms the backbone of long-distance and urban travel across the state, connecting major cities, neighboring states, and key economic corridors.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45f17148190949c330ab9c27706 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69eeb58c34808190b0eb54ba01e2cc13 completed April 27, 2026, 1:02 a.m.
NED1 Entity disambiguation (via context triple) batch_6a09eed9b3b08190b06d34173f50ee7e completed May 17, 2026, 4:37 p.m.
NEDg Description generation batch_6a09ef7271e081908a1cd70297376ae3 completed May 17, 2026, 4:40 p.m.
NED2 Entity disambiguation (via description) batch_6a09f00ec300819082ee644a512a9cdf completed May 17, 2026, 4:42 p.m.
Created at: April 16, 2026, 6:28 p.m.