Triple
T21420075
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Newlands Irrigation Project lands |
E528411
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | reclamation project service area |
C44751
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: reclamation project service area Context triple: [Newlands Irrigation Project lands, instanceOf, reclamation project service area]
-
A.
component of a reclamation project
A component of a reclamation project is an individual physical, technical, or administrative element—such as infrastructure, process, or resource—that contributes to restoring, improving, or repurposing land, water, or other environmental assets.
-
B.
landfill reclamation project
A landfill reclamation project is an organized effort to excavate, process, and remediate an existing landfill site to recover usable materials, restore environmental quality, and enable safe future land use.
-
C.
land reclamation campaign
A land reclamation campaign is a coordinated effort, typically led by governments or organizations, to convert unusable or degraded land—such as wetlands, deserts, or polluted areas—into productive land for agriculture, industry, housing, or environmental restoration.
-
D.
watershed district
A watershed district is a geographically defined area governed by an organization responsible for managing water resources, drainage, and related environmental concerns within a specific river or drainage basin.
-
E.
recreation area
A recreation area is a designated space, either natural or built, intended for leisure, relaxation, and recreational activities such as sports, picnicking, and social gatherings.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c454c248819093425d1099101c09 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 5:47 p.m.