Triple

T21282914
Position Surface form Disambiguated ID Type / Status
Subject Minerva, Ohio E524573 entity
Predicate roadJunctionOf P6234 FINISHED
Object Lincoln Highway and Ohio State Route 183 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lincoln Highway and Ohio State Route 183 | Statement: [Minerva, Ohio, roadJunctionOf, Lincoln Highway and Ohio State Route 183]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lincoln Highway and Ohio State Route 183
Context triple: [Minerva, Ohio, roadJunctionOf, Lincoln Highway and Ohio State Route 183]
  • A. Ohio State Route 66
    Ohio State Route 66 is a north–south state highway in western Ohio that connects several small communities and rural areas between Piqua and Fayette.
  • B. Ohio State Route 198
    Ohio State Route 198 is a north–south state highway in western Ohio that serves as a regional connector through Auglaize County and surrounding rural areas.
  • C. Ohio State Route 93
    Ohio State Route 93 is a north–south state highway in Ohio that runs through the southeastern part of the state, connecting several small towns and rural areas.
  • D. Ohio State Route 61
    Ohio State Route 61 is a north–south state highway in Ohio that connects the Columbus area with the Lake Erie region, passing through several central and northern Ohio communities.
  • E. Ohio State Route 119
    Ohio State Route 119 is an east–west state highway in western Ohio that connects several small communities and rural areas, including parts of Shelby County.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lincoln Highway and Ohio State Route 183
Target entity description: Lincoln Highway and Ohio State Route 183 is a key road junction in Minerva, Ohio, where a historic transcontinental route intersects a state highway.
  • A. Ohio State Route 66
    Ohio State Route 66 is a north–south state highway in western Ohio that connects several small communities and rural areas between Piqua and Fayette.
  • B. Ohio State Route 198
    Ohio State Route 198 is a north–south state highway in western Ohio that serves as a regional connector through Auglaize County and surrounding rural areas.
  • C. Ohio State Route 93
    Ohio State Route 93 is a north–south state highway in Ohio that runs through the southeastern part of the state, connecting several small towns and rural areas.
  • D. Ohio State Route 61
    Ohio State Route 61 is a north–south state highway in Ohio that connects the Columbus area with the Lake Erie region, passing through several central and northern Ohio communities.
  • E. Ohio State Route 119
    Ohio State Route 119 is an east–west state highway in western Ohio that connects several small communities and rural areas, including parts of Shelby County.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5171f6c8190a5d57201ede73811 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e736d3dfbc819081bd876d95c7c480 completed April 21, 2026, 8:35 a.m.
Created at: April 16, 2026, 4:03 p.m.