Triple

T21007456
Position Surface form Disambiguated ID Type / Status
Subject Arts Center station (MARTA) E517448 entity
Predicate operator P179 FINISHED
Object MARTA E589126 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MARTA | Statement: [Arts Center station (MARTA), operator, MARTA]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MARTA
Context triple: [Arts Center station (MARTA), operator, MARTA]
  • A. MARTA chosen
    MARTA is the primary public transit system serving the Atlanta metropolitan area, operating buses and rapid transit rail lines across the region.
  • B. MARTA Bus
    MARTA Bus is the public bus transit system serving the Atlanta metropolitan area as part of the region’s primary mass transit network.
  • C. MARTA Streetcar
    MARTA Streetcar is a modern streetcar transit service operating in Atlanta, Georgia, providing local rail connections through key downtown and nearby neighborhoods.
  • D. MARTA rail network
    The MARTA rail network is the rapid transit system serving the Atlanta metropolitan area, consisting of multiple color-coded lines that connect key neighborhoods, suburbs, and major destinations such as downtown, the airport, and business districts.
  • E. MARTA Breeze fare system
    The MARTA Breeze fare system is the electronic ticketing and payment platform used by Atlanta’s public transit network, enabling riders to pay fares via smart cards and mobile devices.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50192308190a284fcc89dd23a49 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e6fc3cc8648190b1a419ef734a69e6 completed April 21, 2026, 4:25 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0a66ee34e081908c4700097e256e92 completed May 18, 2026, 1:10 a.m.
Created at: April 16, 2026, 1:53 p.m.