Triple

T20709223
Position Surface form Disambiguated ID Type / Status
Subject Jean-Marie-Joseph Coutelle E508987 entity
Predicate instanceOf P0 FINISHED
Object French military engineer C13185 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: French military engineer
Context triple: [Jean-Marie-Joseph Coutelle, instanceOf, French military engineer]
  • A. French engineer chosen
    A French engineer is a professional from France who applies scientific and mathematical principles to design, develop, and optimize technical systems, structures, or processes across various industries.
  • B. French military leader
    A French military leader is a high-ranking officer from France responsible for planning, directing, and commanding military operations and forces in defense of national interests.
  • C. French-American engineer
    A French-American engineer is a professional with dual French and American cultural or national backgrounds who applies engineering principles to design, analyze, and improve systems, structures, or technologies.
  • D. French neoclassical architect
    A French neoclassical architect is a designer of buildings in France who, primarily between the mid-18th and early 19th centuries, employed classical Greek and Roman forms, symmetry, and rational proportion to create monumental, orderly, and often civic-minded architecture.
  • E. French Baroque architect
    A French Baroque architect is a designer of grand, dramatic buildings in 17th- and early 18th-century France, characterized by bold ornamentation, dynamic forms, and a strong sense of theatricality and power.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c40ad88190b81f77695366d328 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:14 p.m.