Triple

T20582542
Position Surface form Disambiguated ID Type / Status
Subject Dabaa E505695 entity
Predicate plantOperatorPlanned P44344 FINISHED
Object Egyptian Nuclear Power Plants Authority
The Egyptian Nuclear Power Plants Authority is the state body responsible for developing, implementing, and overseeing Egypt’s civil nuclear power program.
E1438469 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Egyptian Nuclear Power Plants Authority | Statement: [Dabaa, plantOperatorPlanned, Egyptian Nuclear Power Plants Authority]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Egyptian Nuclear Power Plants Authority
Context triple: [Dabaa, plantOperatorPlanned, Egyptian Nuclear Power Plants Authority]
  • A. Egyptian Electricity Holding Company
    The Egyptian Electricity Holding Company is Egypt’s state-owned utility responsible for the generation, transmission, and distribution of electric power across the country.
  • B. New and Renewable Energy Authority of Egypt
    The New and Renewable Energy Authority of Egypt is a governmental body responsible for planning, promoting, and implementing renewable energy projects and policies across Egypt.
  • C. Ministry of Electricity and Renewable Energy of Egypt
    The Ministry of Electricity and Renewable Energy of Egypt is the national governmental body responsible for formulating and implementing Egypt’s policies on electric power generation, transmission, distribution, and the development of renewable energy sources.
  • D. Ministry of Petroleum and Mineral Resources of Egypt
    The Ministry of Petroleum and Mineral Resources of Egypt is the national governmental body responsible for managing and regulating the country’s oil, gas, and mineral resources sectors.
  • E. Egyptian Mineral Resources Authority
    The Egyptian Mineral Resources Authority is the government agency responsible for managing, regulating, and developing Egypt’s mineral and mining resources.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Egyptian Nuclear Power Plants Authority
Triple: [Dabaa, plantOperatorPlanned, Egyptian Nuclear Power Plants Authority]
Generated description
The Egyptian Nuclear Power Plants Authority is the state body responsible for developing, implementing, and overseeing Egypt’s civil nuclear power program.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Egyptian Nuclear Power Plants Authority
Target entity description: The Egyptian Nuclear Power Plants Authority is the state body responsible for developing, implementing, and overseeing Egypt’s civil nuclear power program.
  • A. Egyptian Electricity Holding Company
    The Egyptian Electricity Holding Company is Egypt’s state-owned utility responsible for the generation, transmission, and distribution of electric power across the country.
  • B. New and Renewable Energy Authority of Egypt
    The New and Renewable Energy Authority of Egypt is a governmental body responsible for planning, promoting, and implementing renewable energy projects and policies across Egypt.
  • C. Ministry of Electricity and Renewable Energy of Egypt
    The Ministry of Electricity and Renewable Energy of Egypt is the national governmental body responsible for formulating and implementing Egypt’s policies on electric power generation, transmission, distribution, and the development of renewable energy sources.
  • D. Ministry of Petroleum and Mineral Resources of Egypt
    The Ministry of Petroleum and Mineral Resources of Egypt is the national governmental body responsible for managing and regulating the country’s oil, gas, and mineral resources sectors.
  • E. Egyptian Mineral Resources Authority
    The Egyptian Mineral Resources Authority is the government agency responsible for managing, regulating, and developing Egypt’s mineral and mining resources.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plantOperatorPlanned
Context triple: [Dabaa, plantOperatorPlanned, Egyptian Nuclear Power Plants Authority]
  • A. operatorPlanned chosen
    Indicates that an operator has scheduled or arranged a specific action, process, or operation to occur.
  • B. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • C. steelPlantOperator
    Indicates that one entity operates or manages a steel plant in relation to another entity.
  • D. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • E. plannedWith
    Indicates that an entity created or arranged a plan in collaboration or coordination with another entity.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b9669c8190b8e81fc72817d42c completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a90f7e34819086b1745dcd53ba25 completed April 20, 2026, 10:30 p.m.
NED1 Entity disambiguation (via context triple) batch_6a08acecf4d8819093280bbcd43150d4 completed May 16, 2026, 5:44 p.m.
NEDg Description generation batch_6a08ad96b2a081908d32e335c5265eec completed May 16, 2026, 5:47 p.m.
NED2 Entity disambiguation (via description) batch_6a08ae19eca08190ada48b48105be62d completed May 16, 2026, 5:49 p.m.
PD Predicate disambiguation batch_69e59fffe1748190825e4eaa90340631 completed April 20, 2026, 3:39 a.m.
Created at: April 16, 2026, 11:40 a.m.