Triple
T20571957
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Organisation Todt |
E505121
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Nazi construction organization |
C2765
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Nazi construction organization Context triple: [Organisation Todt, instanceOf, Nazi construction organization]
-
A.
Nazi architecture project
A Nazi architecture project is a large-scale building or urban planning initiative designed under the Third Reich to embody and propagate Nazi ideology through monumental, authoritarian, and neoclassical forms.
-
B.
institution of Nazi Germany
chosen
An institution of Nazi Germany is any formal organization, governmental body, or structured system established or co-opted by the Nazi regime to implement, enforce, or propagate its totalitarian, racist, and expansionist policies between 1933 and 1945.
-
C.
Nazi SS office
A Nazi SS office was an administrative and operational unit of the Schutzstaffel responsible for planning, coordinating, and executing the regime’s ideological, security, and genocidal policies.
-
D.
Nazi Germany military unit
A Nazi Germany military unit is an organized formation of armed personnel under the command structure of the Third Reich, created to conduct military operations in support of its expansionist and genocidal objectives during World War II.
-
E.
component of the Third Reich
A component of the Third Reich is any organizational, institutional, territorial, or ideological element that contributed to the structure, operation, or objectives of Nazi Germany between 1933 and 1945.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b721588190993ac7b0a9be2736 |
completed | April 16, 2026, 10:06 a.m. |
Created at: April 16, 2026, 11:39 a.m.