Triple

T20532799
Position Surface form Disambiguated ID Type / Status
Subject Interstate 820 E504112 entity
Predicate abbreviation P43 FINISHED
Object I-820
I-820 is a beltway segment of the Interstate Highway System that loops around the Fort Worth area in Texas.
E1435773 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-820 | Statement: [Interstate 820, abbreviation, I-820]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-820
Context triple: [Interstate 820, abbreviation, I-820]
  • A. I-520
    I-520 is an auxiliary Interstate Highway that forms a partial beltway around Augusta, Georgia and North Augusta, South Carolina.
  • B. I-220
    I-220 is an auxiliary Interstate Highway in the United States that serves as a bypass or loop around a primary Interstate route.
  • C. I-229
    I-229 is an auxiliary Interstate Highway that serves as a bypass route around Sioux Falls in southeastern South Dakota.
  • D. I-229
    I-229 is a short auxiliary Interstate Highway in Missouri that serves as a bypass and business route around downtown St. Joseph.
  • E. I-190
    I-190 is a short auxiliary Interstate Highway in Illinois that connects Interstate 90 to Chicago O'Hare International Airport.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: I-820
Triple: [Interstate 820, abbreviation, I-820]
Generated description
I-820 is a beltway segment of the Interstate Highway System that loops around the Fort Worth area in Texas.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: I-820
Target entity description: I-820 is a beltway segment of the Interstate Highway System that loops around the Fort Worth area in Texas.
  • A. I-520
    I-520 is an auxiliary Interstate Highway that forms a partial beltway around Augusta, Georgia and North Augusta, South Carolina.
  • B. I-220
    I-220 is an auxiliary Interstate Highway in the United States that serves as a bypass or loop around a primary Interstate route.
  • C. I-229
    I-229 is an auxiliary Interstate Highway that serves as a bypass route around Sioux Falls in southeastern South Dakota.
  • D. I-229
    I-229 is a short auxiliary Interstate Highway in Missouri that serves as a bypass and business route around downtown St. Joseph.
  • E. I-190
    I-190 is a short auxiliary Interstate Highway in Illinois that connects Interstate 90 to Chicago O'Hare International Airport.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b3a6e08190ae663701f50fab8e completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a06c709881908ef0995426a58759 completed April 20, 2026, 9:53 p.m.
NED1 Entity disambiguation (via context triple) batch_6a089d4a828481909085772ef81a2348 completed May 16, 2026, 4:37 p.m.
NEDg Description generation batch_6a089e8473188190956a0817cd7bbae0 completed May 16, 2026, 4:42 p.m.
NED2 Entity disambiguation (via description) batch_6a089f04483481908fe015bd7514af35 completed May 16, 2026, 4:44 p.m.
Created at: April 16, 2026, 11:37 a.m.