Triple

T20315168
Position Surface form Disambiguated ID Type / Status
Subject Southern Electric E510359 entity
Predicate regulatedBy P86 FINISHED
Object Ofgem E510363 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ofgem | Statement: [Southern Electric, regulatedBy, Ofgem]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ofgem
Context triple: [Southern Electric, regulatedBy, Ofgem]
  • A. Ofgem chosen
    Ofgem is the government regulator for electricity and gas markets in Great Britain, overseeing energy companies and protecting consumer interests.
  • B. Central Electricity Regulatory Commission
    The Central Electricity Regulatory Commission is India’s national-level regulatory body responsible for overseeing and regulating the country’s interstate electricity generation, transmission, and trading to ensure fair tariffs and a reliable power sector.
  • C. Office of Electricity Regulation
    The Office of Electricity Regulation was the former UK government regulator responsible for overseeing and promoting competition in the electricity supply industry before its functions were absorbed into Ofgem.
  • D. Department of Energy (UK)
    The Department of Energy (UK) was a former government department responsible for national energy policy, including oversight of the electricity and fuel industries.
  • E. Central Electricity Authority
    The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c7491c8190961113c4283b10b0 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e67786f4dc8190b02a6c2a4338362d completed April 20, 2026, 6:59 p.m.
NED1 Entity disambiguation (via context triple) batch_6a08694bb61481909a6546986c70f11d completed May 16, 2026, 12:55 p.m.
Created at: April 16, 2026, 11:19 a.m.