Triple

T20272023
Position Surface form Disambiguated ID Type / Status
Subject Tyne Tunnel E499116 entity
Predicate maintainedBy P86 FINISHED
Object TT2 Limited E1422609 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TT2 Limited | Statement: [Tyne Tunnel, maintainedBy, TT2 Limited]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TT2 Limited
Context triple: [Tyne Tunnel, maintainedBy, TT2 Limited]
  • A. TT2 Limited chosen
    TT2 Limited is the company responsible for managing and operating the Tyne Tunnel road crossing in North East England.
  • B. THP Limited
    THP Limited is an engineering firm known for providing structural engineering services for major projects such as Paycor Stadium in Cincinnati, Ohio.
  • C. TRF Limited
    TRF Limited is an Indian engineering and manufacturing company known for providing bulk material handling systems and equipment, particularly serving the steel and mining industries.
  • D. TBT Enterprises
    TBT Enterprises is the company that manages and runs The Basketball Tournament, a high-stakes, winner-take-all summer basketball competition.
  • E. Tangent Productions
    Tangent Productions is a film production company best known for producing Terry Gilliam’s fantasy adventure film "The Adventures of Baron Munchausen."
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6275fa6c8190952924930adee150 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e675de35188190840dc7d04c1d5fd9 completed April 20, 2026, 6:52 p.m.
NED1 Entity disambiguation (via context triple) batch_6a08610f5218819095855364ee873e45 completed May 16, 2026, 12:20 p.m.
Created at: April 11, 2026, 11:42 p.m.