Triple

T20234853
Position Surface form Disambiguated ID Type / Status
Subject PTH 101 E495622 entity
Predicate connectsWith P37 FINISHED
Object Route 52
Route 52 is a numbered roadway that serves as a regional connector route intersecting with Provincial Trunk Highway 101.
E1421436 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Route 52 | Statement: [PTH 101, connectsWith, Route 52]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Route 52
Context triple: [PTH 101, connectsWith, Route 52]
  • A. Route 52
    Route 52 is a metro line in Amsterdam that forms part of the city’s North–South Line, connecting the northern and southern districts through the city center.
  • B. Route 52
    Route 52 is a rural highway in New Zealand that links several small communities in the lower North Island.
  • C. Route 57
    Route 57 is a major north–south freeway in Southern California that connects Orange County to the Pomona area and serves as a key commuter and regional traffic corridor.
  • D. Route 58
    Route 58 is a major highway running through Okinawa, Japan, serving as a key transportation artery that connects several cities and coastal areas on the island.
  • E. Route 55
    Route 55 is a major limited-access highway in southern New Jersey that serves as a key commuter and regional connector through Gloucester County and surrounding areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Route 52
Triple: [PTH 101, connectsWith, Route 52]
Generated description
Route 52 is a numbered roadway that serves as a regional connector route intersecting with Provincial Trunk Highway 101.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Route 52
Target entity description: Route 52 is a numbered roadway that serves as a regional connector route intersecting with Provincial Trunk Highway 101.
  • A. Route 52
    Route 52 is a metro line in Amsterdam that forms part of the city’s North–South Line, connecting the northern and southern districts through the city center.
  • B. Route 52
    Route 52 is a rural highway in New Zealand that links several small communities in the lower North Island.
  • C. Route 57
    Route 57 is a major north–south freeway in Southern California that connects Orange County to the Pomona area and serves as a key commuter and regional traffic corridor.
  • D. Route 58
    Route 58 is a major highway running through Okinawa, Japan, serving as a key transportation artery that connects several cities and coastal areas on the island.
  • E. Route 55
    Route 55 is a major limited-access highway in southern New Jersey that serves as a key commuter and regional connector through Gloucester County and surrounding areas.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626cff80819097b530718a7c98b6 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6716995b88190a8514b41232b0e94 completed April 20, 2026, 6:33 p.m.
NED1 Entity disambiguation (via context triple) batch_6a085a15b7848190b55a1e8b52503690 completed May 16, 2026, 11:50 a.m.
NEDg Description generation batch_6a085a6a94e88190a3f2f2cf89013d44 completed May 16, 2026, 11:52 a.m.
NED2 Entity disambiguation (via description) batch_6a085aca03748190b3d0544ebda3b8a7 completed May 16, 2026, 11:53 a.m.
Created at: April 11, 2026, 11:40 p.m.