| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Usina do Gasômetro |
E495359
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former power plant |
C5370
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former power plant Context triple: [Usina do Gasômetro, instanceOf, former power plant]
-
A.
former industrial plant
chosen
A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
-
B.
coal-fired power station
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
-
C.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
D.
decommissioned nuclear reactor
A decommissioned nuclear reactor is a permanently shut-down nuclear facility that has been defueled, dismantled or secured, and placed under long-term monitoring and waste management to ensure ongoing safety and environmental protection.
-
E.
industrial plant
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626cff80819097b530718a7c98b6 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:39 p.m.