Triple

T19986904
Position Surface form Disambiguated ID Type / Status
Subject Autoroute 25 E493955 entity
Predicate shortName P43 FINISHED
Object A-25
A-25 is a major Quebec autoroute that runs through the Montreal region, connecting the island of Montreal to the Lanaudière area via the Louis-Hippolyte Lafontaine Bridge–Tunnel and the Olivier-Charbonneau Bridge.
E1406168 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A-25 | Statement: [Autoroute 25, shortName, A-25]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A-25
Context triple: [Autoroute 25, shortName, A-25]
  • A. A-2
    The A-2 is a major Spanish motorway that connects Madrid with northeastern regions such as Zaragoza and Barcelona, forming part of the country’s primary eastward transport corridor.
  • B. A-23
    A-23 is the internal station code assigned to Warsaw's Młociny metro station on Line M1.
  • C. A-22
    The A-22 is a Spanish autovía (motorway) in northeastern Spain that connects the city of Huesca with Lleida, improving regional links including access to Monzón.
  • D. A-21
    A-21 is the station code assigned to Stare Bielany, a stop on the Warsaw Metro system.
  • E. A-5
    A-5 is a major Spanish motorway that connects Madrid with the western regions of the country toward Extremadura and the Portuguese border.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A-25
Triple: [Autoroute 25, shortName, A-25]
Generated description
A-25 is a major Quebec autoroute that runs through the Montreal region, connecting the island of Montreal to the Lanaudière area via the Louis-Hippolyte Lafontaine Bridge–Tunnel and the Olivier-Charbonneau Bridge.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A-25
Target entity description: A-25 is a major Quebec autoroute that runs through the Montreal region, connecting the island of Montreal to the Lanaudière area via the Louis-Hippolyte Lafontaine Bridge–Tunnel and the Olivier-Charbonneau Bridge.
  • A. A-2
    The A-2 is a major Spanish motorway that connects Madrid with northeastern regions such as Zaragoza and Barcelona, forming part of the country’s primary eastward transport corridor.
  • B. A-23
    A-23 is the internal station code assigned to Warsaw's Młociny metro station on Line M1.
  • C. A-22
    The A-22 is a Spanish autovía (motorway) in northeastern Spain that connects the city of Huesca with Lleida, improving regional links including access to Monzón.
  • D. A-21
    A-21 is the station code assigned to Stare Bielany, a stop on the Warsaw Metro system.
  • E. A-5
    A-5 is a major Spanish motorway that connects Madrid with the western regions of the country toward Extremadura and the Portuguese border.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626a67648190af9653832a3aeced completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e65d16f60c81909ba02c0a3429ecae completed April 20, 2026, 5:06 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0804fe037081909b88552324ce5907 completed May 16, 2026, 5:47 a.m.
NEDg Description generation batch_6a0807106b008190b979de6e0a6540a0 completed May 16, 2026, 5:56 a.m.
NED2 Entity disambiguation (via description) batch_6a0807a6c0e08190accf4a103f25ab54 completed May 16, 2026, 5:59 a.m.
Created at: April 11, 2026, 3:29 p.m.