Triple
T19854107
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chicago Transit Authority Brown Line stations |
E477084
|
entity |
| Predicate | renovatedDuring |
P3322
|
FINISHED |
| Object | Brown Line Capacity Expansion Project (2000s) |
E892750
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brown Line Capacity Expansion Project (2000s) | Statement: [Chicago Transit Authority Brown Line stations, renovatedDuring, Brown Line Capacity Expansion Project (2000s)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Brown Line Capacity Expansion Project (2000s) Context triple: [Chicago Transit Authority Brown Line stations, renovatedDuring, Brown Line Capacity Expansion Project (2000s)]
-
A.
Brown Line Capacity Expansion Project
chosen
The Brown Line Capacity Expansion Project was a major Chicago Transit Authority initiative to modernize and increase the capacity of the Brown Line, including station upgrades, platform extensions, and infrastructure improvements to accommodate longer trains and more riders.
-
B.
North Line extension of Red Line
The North Line extension of the Red Line is a METRORail light rail expansion in Houston that extends service north from downtown to additional neighborhoods and transit connections.
-
C.
Green Line Extension
The Green Line Extension is a Massachusetts Bay Transportation Authority light rail project that extends Boston’s Green Line service into previously unserved neighborhoods in Somerville and Medford.
-
D.
Fairmount Line Improvement Project
The Fairmount Line Improvement Project is a transit infrastructure initiative aimed at upgrading Boston’s Fairmount commuter rail line to provide more frequent, reliable, and accessible service to surrounding neighborhoods.
-
E.
METRO Green Line (Central Corridor) project
The METRO Green Line (Central Corridor) project is a light rail transit line in the Minneapolis–Saint Paul metropolitan area that connects downtown Minneapolis and downtown St. Paul along University Avenue and surrounding corridors.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51d39d081909bcfafeaaf3d2fcc |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e6586aa1dc8190b6cfe051a57e338b |
completed | April 20, 2026, 4:46 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a07dbbc788881909c8d8d6417182335 |
completed | May 16, 2026, 2:51 a.m. |
Created at: April 10, 2026, 1:51 p.m.