Triple

T19242920
Position Surface form Disambiguated ID Type / Status
Subject skene E481176 entity
Predicate instanceOf P0 FINISHED
Object theatrical structure C4771 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: theatrical structure
Context triple: [skene, instanceOf, theatrical structure]
  • A. theatrical technique
    A theatrical technique is a specific method or practice used in live performance to convey story, emotion, or theme to an audience.
  • B. stage interpretation of a literary work
    A stage interpretation of a literary work is a live theatrical adaptation that transforms the text’s narrative, characters, and themes into performance through acting, staging, and design choices.
  • C. theatrical direction
    Theatrical direction is the conceptual class encompassing the artistic and organizational processes by which a director interprets a script and coordinates performance, staging, and design elements to create a unified live production.
  • D. structure chosen
    A structure is an organized arrangement of interrelated components or elements designed to support, contain, or give form to something within a particular context.
  • E. theatrical movement
    A theatrical movement is a coordinated artistic trend or style in theater characterized by shared aesthetic principles, performance practices, and thematic concerns that distinguish it from other periods or approaches.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cd9d1081908a181d02b88b59b8 completed April 10, 2026, 12:10 p.m.
Created at: April 10, 2026, 1:27 p.m.