Triple

T19212885
Position Surface form Disambiguated ID Type / Status
Subject Maine State Route 264 E480398 entity
Predicate abbreviation P43 FINISHED
Object ME 264
ME 264 is a state highway in Maine that serves as a short connector route within the state's regional road network.
E1363817 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ME 264 | Statement: [Maine State Route 264, abbreviation, ME 264]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ME 264
Context triple: [Maine State Route 264, abbreviation, ME 264]
  • A. ME 236
    ME 236 is a state highway in southern Maine that serves as a key connector between the Portsmouth, New Hampshire area and inland communities such as Kittery and Eliot.
  • B. ME 226
    ME 226 is a state highway in Maine that serves as a connector route between several local communities and major roads in the region.
  • C. ME 164
    ME 164 is a state highway in northern Maine that connects the communities of Presque Isle and Caribou in Aroostook County.
  • D. ME 241
    ME 241 is a state highway in Maine that serves as a local connector route within the state's road network.
  • E. ME 244
    ME 244 is a state highway in Maine that serves as a local connector route, typically linking small communities and other primary roads.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: ME 264
Triple: [Maine State Route 264, abbreviation, ME 264]
Generated description
ME 264 is a state highway in Maine that serves as a short connector route within the state's regional road network.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: ME 264
Target entity description: ME 264 is a state highway in Maine that serves as a short connector route within the state's regional road network.
  • A. ME 236
    ME 236 is a state highway in southern Maine that serves as a key connector between the Portsmouth, New Hampshire area and inland communities such as Kittery and Eliot.
  • B. ME 226
    ME 226 is a state highway in Maine that serves as a connector route between several local communities and major roads in the region.
  • C. ME 164
    ME 164 is a state highway in northern Maine that connects the communities of Presque Isle and Caribou in Aroostook County.
  • D. ME 241
    ME 241 is a state highway in Maine that serves as a local connector route within the state's road network.
  • E. ME 244
    ME 244 is a state highway in Maine that serves as a local connector route, typically linking small communities and other primary roads.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cb8c348190b52075823911c869 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fa38c0e881908e9501ee21d0f266 completed April 20, 2026, 10:04 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0700e6af48819092d63922162e3a7b completed May 15, 2026, 11:17 a.m.
NEDg Description generation batch_6a070159193081908144fd444eb981e4 completed May 15, 2026, 11:19 a.m.
NED2 Entity disambiguation (via description) batch_6a0701b8fadc81909cd1afae9f2c9746 completed May 15, 2026, 11:21 a.m.
Created at: April 10, 2026, 1:21 p.m.