Triple

T19120111
Position Surface form Disambiguated ID Type / Status
Subject Nišava District E468018 entity
Predicate hasMajorTransportCorridor P36974 FINISHED
Object Pan-European Corridor X
Pan-European Corridor X is a key trans-European transport route linking Central Europe with the Balkans and Greece, facilitating major road and rail connections across southeastern Europe.
E1167985 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pan-European Corridor X | Statement: [Nišava District, hasMajorTransportCorridor, Pan-European Corridor X]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pan-European Corridor X
Context triple: [Nišava District, hasMajorTransportCorridor, Pan-European Corridor X]
  • A. Pan-European Corridor IV
    Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
  • B. Pan-European Corridor III
    Pan-European Corridor III is a major trans-European transport route linking Western and Eastern Europe, running from Germany through Poland and Ukraine toward Eastern markets.
  • C. Pan-European Transport Corridor IX
    Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
  • D. Pan-European Corridor Xc
    Pan-European Corridor Xc is a major European transport route that forms a branch of Corridor X, linking central Europe with southern and eastern parts of the Balkan Peninsula.
  • E. Pan-European Corridor V
    Pan-European Corridor V is a major trans-European transport route that links key cities in Central and Eastern Europe, facilitating trade and mobility between Western Europe and countries such as Ukraine and Poland.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Pan-European Corridor X
Triple: [Nišava District, hasMajorTransportCorridor, Pan-European Corridor X]
Generated description
Pan-European Corridor X is a key trans-European transport route linking Central Europe with the Balkans and Greece, facilitating major road and rail connections across southeastern Europe.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Pan-European Corridor X
Target entity description: Pan-European Corridor X is a key trans-European transport route linking Central Europe with the Balkans and Greece, facilitating major road and rail connections across southeastern Europe.
  • A. Pan-European Corridor IV
    Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
  • B. Pan-European Corridor III
    Pan-European Corridor III is a major trans-European transport route linking Western and Eastern Europe, running from Germany through Poland and Ukraine toward Eastern markets.
  • C. Pan-European Transport Corridor IX
    Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
  • D. Pan-European Corridor Xc chosen
    Pan-European Corridor Xc is a major European transport route that forms a branch of Corridor X, linking central Europe with southern and eastern parts of the Balkan Peninsula.
  • E. Pan-European Corridor V
    Pan-European Corridor V is a major trans-European transport route that links key cities in Central and Eastern Europe, facilitating trade and mobility between Western Europe and countries such as Ukraine and Poland.
  • F. None of above.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd06a26481908039e2a1bae8c597 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e3c810808190a88d5c7859e7c650 completed April 20, 2026, 8:28 a.m.
NED1 Entity disambiguation (via context triple) batch_6a05e67400088190a58e085281a62a54 completed May 14, 2026, 3:12 p.m.
NEDg Description generation batch_6a05e74c4a248190b4e02f0c0d53f904 completed May 14, 2026, 3:16 p.m.
NED2 Entity disambiguation (via description) batch_6a05e84cbbac8190aa3e935e67cac797 completed May 14, 2026, 3:20 p.m.
Created at: April 10, 2026, 12:05 p.m.