Triple
T18860789
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Saurashtra Railway |
E461305
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former Indian railway system |
C41403
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former Indian railway system Context triple: [Saurashtra Railway, instanceOf, former Indian railway system]
-
A.
former British Rail sector
A former British Rail sector is an organizational division that once managed specific types of rail services or geographic areas within the state-owned British Rail system before its restructuring and privatization.
-
B.
Indian Railways recruitment examination
The Indian Railways recruitment examination is a competitive, nationwide test conducted by Indian Railways and the Railway Recruitment Boards to select eligible candidates for various technical, non-technical, and security-related posts across the railway network.
-
C.
national railway system
A national railway system is a coordinated network of rail infrastructure, services, and governance that provides passenger and freight transportation across a country.
-
D.
zone of Indian Railways
A zone of Indian Railways is a major administrative and operational division that oversees railway infrastructure, train operations, and services within a defined geographic region of India’s rail network.
-
E.
former railway facility
A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfb7b9c8190854e7b171b98ea2e |
completed | April 10, 2026, 11:20 a.m. |
Created at: April 10, 2026, 11:57 a.m.