Triple
T18581809
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Azalea Collection |
E454132
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | azalea display |
C1514
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: azalea display Context triple: [Azalea Collection, instanceOf, azalea display]
-
A.
natural flower display
A natural flower display is an arrangement of living or freshly cut flowers presented in a way that highlights their inherent colors, forms, and seasonal beauty without artificial embellishment.
-
B.
flower show
A flower show is a public event where various types of flowers and floral arrangements are displayed, judged, and admired, often celebrating horticulture and design.
-
C.
horticultural show
chosen
A horticultural show is a public event where plants, flowers, garden designs, and related horticultural exhibits are displayed and often judged for quality, creativity, and educational value.
-
D.
animatronic display
An animatronic display is a mechanized figure or scene that uses motors, electronics, and programmed movements to simulate lifelike actions for entertainment, education, or thematic presentation.
-
E.
flower kiosk
A flower kiosk is a small, often temporary retail stand or booth that sells fresh flowers, bouquets, and related floral products to passersby in high-traffic areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38974308190a9174430ef256b73 |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:43 a.m.