Triple

T18410734
Position Surface form Disambiguated ID Type / Status
Subject CrossCountry network E441750 entity
Predicate instanceOf P0 FINISHED
Object long-distance rail network C3549 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: long-distance rail network
Context triple: [CrossCountry network, instanceOf, long-distance rail network]
  • A. railway network chosen
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • B. freight railroad network
    A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
  • C. national railway system
    A national railway system is a coordinated network of rail infrastructure, services, and governance that provides passenger and freight transportation across a country.
  • D. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • E. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9eb8a508190a942fd75ebd8b1dc completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:47 a.m.