Triple

T18143729
Position Surface form Disambiguated ID Type / Status
Subject Alabama State Route 150 E434327 entity
Predicate abbreviation P43 FINISHED
Object AL 150
AL 150 is a state highway in Alabama that serves as a key east–west route connecting several suburbs and commercial areas, particularly around the Birmingham metropolitan region.
E1308100 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: AL 150 | Statement: [Alabama State Route 150, abbreviation, AL 150]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: AL 150
Context triple: [Alabama State Route 150, abbreviation, AL 150]
  • A. AL 155
    AL 155 is a state highway in Alabama that serves as a connector route within the state's road network.
  • B. AL 145
    AL 145 is a state highway in Alabama that serves as a connector route in the central part of the state.
  • C. AL 14
    AL 14 is a state highway in Alabama that runs east–west across the central part of the state, connecting several communities and major routes.
  • D. AL 25
    AL 25 is a state highway in Alabama that runs through central parts of the state, connecting several small towns and rural areas.
  • E. AL 3
    AL 3 is a state highway designation in Alabama that corresponds primarily to U.S. Route 31, running north–south through the state and connecting multiple major cities and communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: AL 150
Triple: [Alabama State Route 150, abbreviation, AL 150]
Generated description
AL 150 is a state highway in Alabama that serves as a key east–west route connecting several suburbs and commercial areas, particularly around the Birmingham metropolitan region.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: AL 150
Target entity description: AL 150 is a state highway in Alabama that serves as a key east–west route connecting several suburbs and commercial areas, particularly around the Birmingham metropolitan region.
  • A. AL 155
    AL 155 is a state highway in Alabama that serves as a connector route within the state's road network.
  • B. AL 145
    AL 145 is a state highway in Alabama that serves as a connector route in the central part of the state.
  • C. AL 14
    AL 14 is a state highway in Alabama that runs east–west across the central part of the state, connecting several communities and major routes.
  • D. AL 25
    AL 25 is a state highway in Alabama that runs through central parts of the state, connecting several small towns and rural areas.
  • E. AL 3
    AL 3 is a state highway designation in Alabama that corresponds primarily to U.S. Route 31, running north–south through the state and connecting multiple major cities and communities.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90aac308190801e2c57d8c5bfe5 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4de0da3e081908732ed022f5eb90a completed April 19, 2026, 1:52 p.m.
NED1 Entity disambiguation (via context triple) batch_6a038552a3e081908d055737dd85b2c6 completed May 12, 2026, 7:53 p.m.
NEDg Description generation batch_6a03887c8e4c819084d905bd116799fc completed May 12, 2026, 8:07 p.m.
NED2 Entity disambiguation (via description) batch_6a0388ea54a0819089def110dd41b4d4 completed May 12, 2026, 8:09 p.m.
Created at: April 10, 2026, 10:29 a.m.