Triple
T18143729
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Alabama State Route 150 |
E434327
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object |
AL 150
AL 150 is a state highway in Alabama that serves as a key east–west route connecting several suburbs and commercial areas, particularly around the Birmingham metropolitan region.
|
E1308100
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: AL 150 | Statement: [Alabama State Route 150, abbreviation, AL 150]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: AL 150 Context triple: [Alabama State Route 150, abbreviation, AL 150]
-
A.
AL 155
AL 155 is a state highway in Alabama that serves as a connector route within the state's road network.
-
B.
AL 145
AL 145 is a state highway in Alabama that serves as a connector route in the central part of the state.
-
C.
AL 14
AL 14 is a state highway in Alabama that runs east–west across the central part of the state, connecting several communities and major routes.
-
D.
AL 25
AL 25 is a state highway in Alabama that runs through central parts of the state, connecting several small towns and rural areas.
-
E.
AL 3
AL 3 is a state highway designation in Alabama that corresponds primarily to U.S. Route 31, running north–south through the state and connecting multiple major cities and communities.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: AL 150 Triple: [Alabama State Route 150, abbreviation, AL 150]
Generated description
AL 150 is a state highway in Alabama that serves as a key east–west route connecting several suburbs and commercial areas, particularly around the Birmingham metropolitan region.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: AL 150 Target entity description: AL 150 is a state highway in Alabama that serves as a key east–west route connecting several suburbs and commercial areas, particularly around the Birmingham metropolitan region.
-
A.
AL 155
AL 155 is a state highway in Alabama that serves as a connector route within the state's road network.
-
B.
AL 145
AL 145 is a state highway in Alabama that serves as a connector route in the central part of the state.
-
C.
AL 14
AL 14 is a state highway in Alabama that runs east–west across the central part of the state, connecting several communities and major routes.
-
D.
AL 25
AL 25 is a state highway in Alabama that runs through central parts of the state, connecting several small towns and rural areas.
-
E.
AL 3
AL 3 is a state highway designation in Alabama that corresponds primarily to U.S. Route 31, running north–south through the state and connecting multiple major cities and communities.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b90aac308190801e2c57d8c5bfe5 |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e4de0da3e081908732ed022f5eb90a |
completed | April 19, 2026, 1:52 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a038552a3e081908d055737dd85b2c6 |
completed | May 12, 2026, 7:53 p.m. |
| NEDg | Description generation | batch_6a03887c8e4c819084d905bd116799fc |
completed | May 12, 2026, 8:07 p.m. |
| NED2 | Entity disambiguation (via description) | batch_6a0388ea54a0819089def110dd41b4d4 |
completed | May 12, 2026, 8:09 p.m. |
Created at: April 10, 2026, 10:29 a.m.