Triple

T18067443
Position Surface form Disambiguated ID Type / Status
Subject Tennessee State Route 55 E432328 entity
Predicate abbreviation P43 FINISHED
Object SR 55
SR 55 is a primary state highway in Tennessee that connects several communities in the south-central part of the state, serving as an important regional transportation route.
E1307341 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 55 | Statement: [Tennessee State Route 55, abbreviation, SR 55]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 55
Context triple: [Tennessee State Route 55, abbreviation, SR 55]
  • A. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • B. SR 51
    SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
  • C. SR 53
    SR 53 is a state highway designation used for numbered routes in various U.S. states.
  • D. SR 57
    SR 57 is a major north–south state highway in Southern California that connects Orange County to the Pomona area and serves as a key commuter and freight corridor.
  • E. SR 57
    SR 57 is a state highway in Ohio that serves as a regional connector route through several communities in the northern part of the state.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 55
Triple: [Tennessee State Route 55, abbreviation, SR 55]
Generated description
SR 55 is a primary state highway in Tennessee that connects several communities in the south-central part of the state, serving as an important regional transportation route.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 55
Target entity description: SR 55 is a primary state highway in Tennessee that connects several communities in the south-central part of the state, serving as an important regional transportation route.
  • A. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • B. SR 51
    SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
  • C. SR 53
    SR 53 is a state highway designation used for numbered routes in various U.S. states.
  • D. SR 57
    SR 57 is a major north–south state highway in Southern California that connects Orange County to the Pomona area and serves as a key commuter and freight corridor.
  • E. SR 57
    SR 57 is a state highway in Ohio that serves as a regional connector route through several communities in the northern part of the state.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9070cac81909fa9473fb1c3f1c7 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4cceb020081909329492591e7b1f2 completed April 19, 2026, 12:39 p.m.
NED1 Entity disambiguation (via context triple) batch_6a037c2d478c8190a0f5692bf0781d76 completed May 12, 2026, 7:14 p.m.
NEDg Description generation batch_6a03804b22c481908f0ab678902df9d4 completed May 12, 2026, 7:32 p.m.
NED2 Entity disambiguation (via description) batch_6a0380f5d2688190a26f88298798ac38 completed May 12, 2026, 7:35 p.m.
Created at: April 10, 2026, 10:26 a.m.