Triple

T17988682
Position Surface form Disambiguated ID Type / Status
Subject Oberaudorf E430308 entity
Predicate hasTransportConnection P845 FINISHED
Object A93 motorway
The A93 motorway is a major German autobahn in Bavaria that connects the Rosenheim area southward toward the Austrian border near Kufstein, serving as an important north–south transit route.
E2111444 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A93 motorway | Statement: [Oberaudorf, hasTransportConnection, A93 motorway]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A93 motorway
Triple: [Oberaudorf, hasTransportConnection, A93 motorway]
Generated description
The A93 motorway is a major German autobahn in Bavaria that connects the Rosenheim area southward toward the Austrian border near Kufstein, serving as an important north–south transit route.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90364248190a37381adea932f42 completed April 10, 2026, 8:46 a.m.
NER Named-entity recognition batch_69e4b29d3ad4819096c2600aa2a99f21 completed April 19, 2026, 10:46 a.m.
NED1 Entity disambiguation (via context triple) batch_6a37660ababc8190b81679d34aa60088 completed June 21, 2026, 4:18 a.m.
NEDg Description generation batch_6a3768b4557c8190b6c4b370726e5b50 completed June 21, 2026, 4:29 a.m.
NED2 Entity disambiguation (via description) batch_6a376918bbb8819081ac8dee61a027f2 completed June 21, 2026, 4:31 a.m.
Created at: April 10, 2026, 10:23 a.m.