Triple
T17933878
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | South West Main Line (London Waterloo to Basingstoke) |
E448401
|
entity |
| Predicate | lineNumber |
P1864
|
FINISHED |
| Object |
SWML
SWML is a major British railway route designation referring to the South West Main Line running from London Waterloo towards southwest England.
|
E1296471
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SWML | Statement: [South West Main Line (London Waterloo to Basingstoke), lineNumber, SWML]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: SWML Context triple: [South West Main Line (London Waterloo to Basingstoke), lineNumber, SWML]
-
A.
SWM
SWM is the municipal utility company of Munich, Germany, responsible for providing services such as energy, water, and public transportation.
-
B.
WAML
WAML is the ICAO airport code for Mutiara SIS Al-Jufrie Airport in Palu, Central Sulawesi, Indonesia.
-
C.
SWMP
SWMP (System-Wide Monitoring Program) is a long-term environmental monitoring initiative that tracks water quality, weather, and ecological conditions across the National Estuarine Research Reserve System.
-
D.
SWB
SWB is the commonly used abbreviation for Southwestern Bell, a major former regional telephone company in the United States that became part of AT&T.
-
E.
WLM
WLM (Workload Manager) is an IBM z/OS component that dynamically manages and prioritizes system workloads to meet performance goals and service-level objectives.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SWML Triple: [South West Main Line (London Waterloo to Basingstoke), lineNumber, SWML]
Generated description
SWML is a major British railway route designation referring to the South West Main Line running from London Waterloo towards southwest England.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: SWML Target entity description: SWML is a major British railway route designation referring to the South West Main Line running from London Waterloo towards southwest England.
-
A.
SWM
SWM is the municipal utility company of Munich, Germany, responsible for providing services such as energy, water, and public transportation.
-
B.
WAML
WAML is the ICAO airport code for Mutiara SIS Al-Jufrie Airport in Palu, Central Sulawesi, Indonesia.
-
C.
SWMP
SWMP (System-Wide Monitoring Program) is a long-term environmental monitoring initiative that tracks water quality, weather, and ecological conditions across the National Estuarine Research Reserve System.
-
D.
SWB
SWB is the commonly used abbreviation for Southwestern Bell, a major former regional telephone company in the United States that became part of AT&T.
-
E.
WLM
WLM (Workload Manager) is an IBM z/OS component that dynamically manages and prioritizes system workloads to meet performance goals and service-level objectives.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f79d14819095540856928f0e25 |
completed | April 10, 2026, 8:51 a.m. |
| NER | Named-entity recognition | batch_69e4a5547b7881909dc41bb7dd34194f |
completed | April 19, 2026, 9:50 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a03213a24b48190aad2297210e86d78 |
completed | May 12, 2026, 12:46 p.m. |
| NEDg | Description generation | batch_6a0322181a5c8190b34ea80445fc5596 |
completed | May 12, 2026, 12:50 p.m. |
| NED2 | Entity disambiguation (via description) | batch_6a0322a4c9448190823e9fdc03ea9f90 |
completed | May 12, 2026, 12:52 p.m. |
Created at: April 10, 2026, 10:21 a.m.