Triple

T17821160
Position Surface form Disambiguated ID Type / Status
Subject Val de Bagnes E444986 entity
Predicate hasLandmark P105 FINISHED
Object Mauvoisin Dam
Mauvoisin Dam is a large arch dam in the Swiss Alps, known for creating Lac de Mauvoisin and serving as a major hydroelectric power source in the Valais region.
E1289959 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mauvoisin Dam | Statement: [Val de Bagnes, hasLandmark, Mauvoisin Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mauvoisin Dam
Context triple: [Val de Bagnes, hasLandmark, Mauvoisin Dam]
  • A. Vaalkop Dam
    Vaalkop Dam is a major reservoir in South Africa used primarily for water supply and irrigation in the Crocodile (West) and Marico region.
  • B. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • C. Rivelin Dams
    Rivelin Dams are a series of reservoirs in Sheffield, South Yorkshire, built to supply water and manage flow along the River Rivelin valley.
  • D. Kegums Dam
    Kegums Dam is a major hydroelectric dam on the Daugava River in Latvia, forming part of one of the country’s earliest and most important power-generating complexes.
  • E. Edea Dam
    Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mauvoisin Dam
Triple: [Val de Bagnes, hasLandmark, Mauvoisin Dam]
Generated description
Mauvoisin Dam is a large arch dam in the Swiss Alps, known for creating Lac de Mauvoisin and serving as a major hydroelectric power source in the Valais region.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mauvoisin Dam
Target entity description: Mauvoisin Dam is a large arch dam in the Swiss Alps, known for creating Lac de Mauvoisin and serving as a major hydroelectric power source in the Valais region.
  • A. Vaalkop Dam
    Vaalkop Dam is a major reservoir in South Africa used primarily for water supply and irrigation in the Crocodile (West) and Marico region.
  • B. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • C. Rivelin Dams
    Rivelin Dams are a series of reservoirs in Sheffield, South Yorkshire, built to supply water and manage flow along the River Rivelin valley.
  • D. Kegums Dam
    Kegums Dam is a major hydroelectric dam on the Daugava River in Latvia, forming part of one of the country’s earliest and most important power-generating complexes.
  • E. Edea Dam
    Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f0de78819099395b14db75a8a6 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e48910eb8881908db8ec08e2752d7d completed April 19, 2026, 7:49 a.m.
NED1 Entity disambiguation (via context triple) batch_6a02ff680b548190b6f1fbc09335ff31 completed May 12, 2026, 10:22 a.m.
NEDg Description generation batch_6a0300ca1ac88190b474ac8276d55445 completed May 12, 2026, 10:28 a.m.
NED2 Entity disambiguation (via description) batch_6a03017f7ea08190b3a98db1c429d04f completed May 12, 2026, 10:31 a.m.
Created at: April 10, 2026, 10:15 a.m.