Triple

T17789266
Position Surface form Disambiguated ID Type / Status
Subject East Bay Expressway E444110 entity
Predicate instanceOf P0 FINISHED
Object roadway project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: roadway project
Context triple: [East Bay Expressway, instanceOf, roadway project]
  • A. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • B. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • C. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • D. road
    A road is a prepared surface or pathway designed for the movement of vehicles, pedestrians, or animals between different locations.
  • E. roadway approach
    A roadway approach is the segment of a road leading up to an intersection, junction, or control device, where vehicles transition from through movement to potential stopping, turning, or yielding maneuvers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ef17708190bdf7e2adbf14ddc2 completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:12 a.m.