Triple

T17668886
Position Surface form Disambiguated ID Type / Status
Subject Interstate 269 E440460 entity
Predicate connectsTo P845 FINISHED
Object Interstate 240 E143465 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 240 | Statement: [Interstate 269, connectsTo, Interstate 240]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 240
Context triple: [Interstate 269, connectsTo, Interstate 240]
  • A. Interstate 240 chosen
    Interstate 240 is an auxiliary Interstate highway that forms a beltway around much of Memphis, Tennessee, facilitating regional traffic flow and access to the city.
  • B. Interstate 664
    Interstate 664 is a highway in southeastern Virginia that serves as the western segment of the Hampton Roads Beltway, connecting the cities of Hampton and Suffolk via a major bridge–tunnel crossing.
  • C. Interstate 640
    Interstate 640 is an auxiliary beltway of Interstate 40 that serves as a northern bypass around Knoxville, Tennessee.
  • D. Interstate 271
    Interstate 271 is a major auxiliary Interstate Highway in northeastern Ohio that serves as an eastern bypass of Cleveland, connecting several suburbs and intersecting key regional routes.
  • E. Interstate 235
    Interstate 235 is an auxiliary Interstate Highway that serves as a major east–west freeway through Des Moines, Iowa, connecting the city's downtown and surrounding suburbs to the regional Interstate network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9e87e18819087104a44dc4dc5b1 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e46f6723d081908eaa57eef6d70bd0 completed April 19, 2026, 6 a.m.
NED1 Entity disambiguation (via context triple) batch_6a02ff4cbb2881909cab1798d17a8860 completed May 12, 2026, 10:22 a.m.
Created at: April 10, 2026, 9:58 a.m.