Triple

T17478241
Position Surface form Disambiguated ID Type / Status
Subject Bratislava city ring road E425592 entity
Predicate instanceOf P0 FINISHED
Object urban bypass C19823 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban bypass
Context triple: [Bratislava city ring road, instanceOf, urban bypass]
  • A. urban beltway chosen
    An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
  • B. urban arterial road
    An urban arterial road is a high-capacity city street designed to carry large volumes of traffic efficiently between local streets and major highways while providing controlled access to adjacent land uses.
  • C. former road bypass
    A former road bypass is a roadway that was originally constructed to divert through-traffic around a town or congested area but has since been decommissioned, reclassified, or repurposed so it no longer functions as the primary bypass route.
  • D. highway
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • E. elevated expressway
    An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889dbc2e88190b18ea6115e819258 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:47 a.m.