Triple

T17471679
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 87 E425428 entity
Predicate hasJunctionWith P1018 FINISHED
Object Interstate 90 in Billings
Interstate 90 in Billings is a major east–west freeway segment of the transcontinental I-90 corridor that serves as a key transportation artery through Billings, Montana, connecting the city to regional and national highway networks.
E1270187 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 90 in Billings | Statement: [U.S. Route 87, hasJunctionWith, Interstate 90 in Billings]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 90 in Billings
Context triple: [U.S. Route 87, hasJunctionWith, Interstate 90 in Billings]
  • A. Interstate 90 near Missoula
    Interstate 90 near Missoula is a major east–west highway segment in western Montana that spans the confluence area of the Clark Fork and Bitterroot rivers, serving as a key transportation corridor through the region.
  • B. Interstate 90 in South Dakota
    Interstate 90 in South Dakota is a major east–west transcontinental freeway crossing the state and serving as a key route for regional travel, commerce, and access to attractions like the Black Hills and Badlands.
  • C. Interstate 90 in Ellensburg, Washington
    Interstate 90 in Ellensburg, Washington is a major east–west freeway segment in central Washington State that serves as a key junction and transition point between regional and interstate routes.
  • D. Interstate 90 in Illinois
    Interstate 90 in Illinois is a major east–west highway, including the Jane Addams Memorial Tollway and the Kennedy Expressway, that connects the Chicago metropolitan area with Wisconsin to the north and Indiana to the southeast.
  • E. Interstate 90 in New York
    Interstate 90 in New York is the state’s primary east–west toll and freeway corridor, largely following the New York State Thruway from the Pennsylvania border through major cities like Buffalo, Rochester, Syracuse, and Albany to the Massachusetts line.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 90 in Billings
Triple: [U.S. Route 87, hasJunctionWith, Interstate 90 in Billings]
Generated description
Interstate 90 in Billings is a major east–west freeway segment of the transcontinental I-90 corridor that serves as a key transportation artery through Billings, Montana, connecting the city to regional and national highway networks.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 90 in Billings
Target entity description: Interstate 90 in Billings is a major east–west freeway segment of the transcontinental I-90 corridor that serves as a key transportation artery through Billings, Montana, connecting the city to regional and national highway networks.
  • A. Interstate 90 near Missoula
    Interstate 90 near Missoula is a major east–west highway segment in western Montana that spans the confluence area of the Clark Fork and Bitterroot rivers, serving as a key transportation corridor through the region.
  • B. Interstate 90 in South Dakota
    Interstate 90 in South Dakota is a major east–west transcontinental freeway crossing the state and serving as a key route for regional travel, commerce, and access to attractions like the Black Hills and Badlands.
  • C. Interstate 90 in Ellensburg, Washington
    Interstate 90 in Ellensburg, Washington is a major east–west freeway segment in central Washington State that serves as a key junction and transition point between regional and interstate routes.
  • D. Interstate 90 in Illinois
    Interstate 90 in Illinois is a major east–west highway, including the Jane Addams Memorial Tollway and the Kennedy Expressway, that connects the Chicago metropolitan area with Wisconsin to the north and Indiana to the southeast.
  • E. Interstate 90 in New York
    Interstate 90 in New York is the state’s primary east–west toll and freeway corridor, largely following the New York State Thruway from the Pennsylvania border through major cities like Buffalo, Rochester, Syracuse, and Albany to the Massachusetts line.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889dbc2e88190b18ea6115e819258 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e451b8a51081908d94bebe2417e3d3 completed April 19, 2026, 3:53 a.m.
NED1 Entity disambiguation (via context triple) batch_6a01b82b4bc08190b293c18f49909cb0 completed May 11, 2026, 11:06 a.m.
NEDg Description generation batch_6a01b8b8785081909b154331f92e2957 completed May 11, 2026, 11:08 a.m.
NED2 Entity disambiguation (via description) batch_6a01b9343028819082933b51bb092b3d completed May 11, 2026, 11:10 a.m.
Created at: April 10, 2026, 5:47 a.m.