Triple

T17120424
Position Surface form Disambiguated ID Type / Status
Subject VBZ tram system E415449 entity
Predicate hasRollingStockType P1305 FINISHED
Object Tram 2000 E591835 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tram 2000 | Statement: [VBZ tram system, hasRollingStockType, Tram 2000]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tram 2000
Context triple: [VBZ tram system, hasRollingStockType, Tram 2000]
  • A. Tram 2000 chosen
    Tram 2000 is a series of articulated light rail vehicles used for urban public transport in Zürich, Switzerland.
  • B. Tramway T2
    Tramway T2 is a Paris-region light rail line connecting La Défense to Porte de Versailles via western suburbs such as Saint-Cloud.
  • C. Tramway T3b
    Tramway T3b is a Paris tram line running along the northeastern edge of the city, serving as part of the modern orbital tram network that connects multiple metro and RER lines.
  • D. Tramway T13 Express
    Tramway T13 Express is a regional express tram-train line in the Île-de-France area that connects suburban communities with Paris’s wider public transport network.
  • E. Tramway T12 Express
    Tramway T12 Express is a regional light rail line in the southern suburbs of Paris that connects Massy-Palaiseau to Évry-Courcouronnes, improving suburban east–west transit in Île-de-France.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d090cc8190a39cb94992586905 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3e8092b548190b45c1695be47edc2 completed April 18, 2026, 8:22 p.m.
NED1 Entity disambiguation (via context triple) batch_6a013a0e11108190bfcf858142aa9ff3 completed May 11, 2026, 2:08 a.m.
Created at: April 10, 2026, 5:36 a.m.