Triple

T16812257
Position Surface form Disambiguated ID Type / Status
Subject British Rail Class 800 E408642 entity
Predicate builtAt P283 FINISHED
Object Kasado Works, Japan E591242 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kasado Works, Japan | Statement: [British Rail Class 800, builtAt, Kasado Works, Japan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kasado Works, Japan
Context triple: [British Rail Class 800, builtAt, Kasado Works, Japan]
  • A. Kasado Works, Kudamatsu, Japan chosen
    Kasado Works in Kudamatsu, Japan is a major Hitachi rail manufacturing facility known for producing high-speed and commuter trains for both domestic and international markets.
  • B. Fujinomiya, Japan
    Fujinomiya, Japan is a city in Shizuoka Prefecture known as a gateway to Mount Fuji and for its scenic views, shrines, and local cuisine.
  • C. Yamazaki, Japan
    Yamazaki, Japan is a historical battlefield area near Kyoto, best known as the site where Akechi Mitsuhide was defeated and killed following his betrayal of Oda Nobunaga in 1582.
  • D. Setagawa
    Setagawa is a river in Japan that flows out of Lake Biwa through the city of Ōtsu in Shiga Prefecture.
  • E. Tsutsumi plant, Japan
    The Tsutsumi plant in Japan is a major Toyota manufacturing facility known for producing popular models like the Toyota Camry and for its advanced, environmentally focused production technologies.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d88393905081908d00a86b99996ac8 completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e3b2df5c888190a462614e1432c357 completed April 18, 2026, 4:35 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00b292a5888190812539b14eb77f34 completed May 10, 2026, 4:30 p.m.
Created at: April 10, 2026, 5:23 a.m.