Triple

T16363624
Position Surface form Disambiguated ID Type / Status
Subject Oklahoma City Air Logistics Complex E397377 entity
Predicate instanceOf P0 FINISHED
Object Maintenance, repair, and overhaul facility C4156 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Maintenance, repair, and overhaul facility
Context triple: [Oklahoma City Air Logistics Complex, instanceOf, Maintenance, repair, and overhaul facility]
  • A. maintenance facility chosen
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • B. maintenance, repair and overhaul provider
    A maintenance, repair and overhaul provider is an organization that performs inspection, servicing, repair, and refurbishment of equipment or systems to ensure their continued safe, reliable, and efficient operation.
  • C. private automotive facility
    A private automotive facility is a secure, non-public site equipped for storing, maintaining, testing, or customizing vehicles, typically owned or controlled by an individual, organization, or manufacturer.
  • D. munitions facility
    A munitions facility is an industrial site where explosive weapons, ammunition, and related components are manufactured, assembled, stored, and sometimes tested under controlled conditions.
  • E. ordnance facility
    An ordnance facility is a specialized site where military weapons, ammunition, and related explosive materials are manufactured, stored, maintained, and sometimes tested under controlled conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f2778dc8190aa95c7572db127e6 completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:08 a.m.