Triple
T16353896
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Friendship Bridge over the Amu Darya |
E397123
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Afghanistan–Uzbekistan border infrastructure
Afghanistan–Uzbekistan border infrastructure comprises the transport, trade, and crossing facilities—most notably the Soviet-built Friendship Bridge over the Amu Darya—that connect the two countries and support regional transit.
|
E1208820
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Afghanistan–Uzbekistan border infrastructure | Statement: [Friendship Bridge over the Amu Darya, partOf, Afghanistan–Uzbekistan border infrastructure]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Afghanistan–Uzbekistan border infrastructure Context triple: [Friendship Bridge over the Amu Darya, partOf, Afghanistan–Uzbekistan border infrastructure]
-
A.
Afghanistan–Tajikistan border
The Afghanistan–Tajikistan border is a mountainous, riverine frontier in Central Asia that separates northern Afghanistan from southern Tajikistan and includes the remote Wakhan Corridor region.
-
B.
Afghanistan–Turkmenistan border
The Afghanistan–Turkmenistan border is the international boundary separating Afghanistan from Turkmenistan in Central Asia, running largely through arid steppe and desert regions and serving as a key corridor for regional trade and energy transit.
-
C.
Afghanistan–Pakistan border
The Afghanistan–Pakistan border, often called the Durand Line, is a historically contentious and porous frontier separating Afghanistan and Pakistan, marked by complex ethnic, political, and security dynamics.
-
D.
Kabul–Mazar-i-Sharif road
The Kabul–Mazar-i-Sharif road is a major highway in Afghanistan that connects the capital Kabul with the northern city of Mazar-i-Sharif, traversing the Hindu Kush mountains via the strategic Salang Pass.
-
E.
Afghanistan–China border
The Afghanistan–China border is a remote, high-altitude frontier running through the narrow Wakhan Corridor in the Pamir Mountains, linking northeastern Afghanistan with China’s Xinjiang region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Afghanistan–Uzbekistan border infrastructure Triple: [Friendship Bridge over the Amu Darya, partOf, Afghanistan–Uzbekistan border infrastructure]
Generated description
Afghanistan–Uzbekistan border infrastructure comprises the transport, trade, and crossing facilities—most notably the Soviet-built Friendship Bridge over the Amu Darya—that connect the two countries and support regional transit.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Afghanistan–Uzbekistan border infrastructure Target entity description: Afghanistan–Uzbekistan border infrastructure comprises the transport, trade, and crossing facilities—most notably the Soviet-built Friendship Bridge over the Amu Darya—that connect the two countries and support regional transit.
-
A.
Afghanistan–Tajikistan border
The Afghanistan–Tajikistan border is a mountainous, riverine frontier in Central Asia that separates northern Afghanistan from southern Tajikistan and includes the remote Wakhan Corridor region.
-
B.
Afghanistan–Turkmenistan border
The Afghanistan–Turkmenistan border is the international boundary separating Afghanistan from Turkmenistan in Central Asia, running largely through arid steppe and desert regions and serving as a key corridor for regional trade and energy transit.
-
C.
Afghanistan–Pakistan border
The Afghanistan–Pakistan border, often called the Durand Line, is a historically contentious and porous frontier separating Afghanistan and Pakistan, marked by complex ethnic, political, and security dynamics.
-
D.
Kabul–Mazar-i-Sharif road
The Kabul–Mazar-i-Sharif road is a major highway in Afghanistan that connects the capital Kabul with the northern city of Mazar-i-Sharif, traversing the Hindu Kush mountains via the strategic Salang Pass.
-
E.
Afghanistan–China border
The Afghanistan–China border is a remote, high-altitude frontier running through the narrow Wakhan Corridor in the Pamir Mountains, linking northeastern Afghanistan with China’s Xinjiang region.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f26864c819088365ca381a003c2 |
completed | April 10, 2026, 4:40 a.m. |
| NER | Named-entity recognition | batch_69e2facd80dc8190b08f0eecbf787240 |
completed | April 18, 2026, 3:30 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a002db841dc8190bfe8a0d8fca1b309 |
completed | May 10, 2026, 7:03 a.m. |
| NEDg | Description generation | batch_6a002f46da5c81909c6e726fe89a3f81 |
completed | May 10, 2026, 7:09 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a003063fd748190ba42c55b008202fc |
completed | May 10, 2026, 7:14 a.m. |
Created at: April 10, 2026, 5:07 a.m.