Triple

T16350420
Position Surface form Disambiguated ID Type / Status
Subject Palembang LRT E397047 entity
Predicate hasElectrificationVoltage P1870 FINISHED
Object 750 V DC LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 750 V DC | Statement: [Palembang LRT, hasElectrificationVoltage, 750 V DC]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasElectrificationVoltage
Context triple: [Palembang LRT, hasElectrificationVoltage, 750 V DC]
  • A. hasElectrificationStatus
    Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
  • B. usesElectricityVoltage chosen
    Indicates that one entity operates using or is characterized by a specified level of electrical voltage supplied by another entity or source.
  • C. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • D. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • E. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f26864c819088365ca381a003c2 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e2facb37d0819093fe45446f1e79c1 completed April 18, 2026, 3:30 a.m.
PD Predicate disambiguation batch_69e226f37ecc819082af58b29b4e39d1 completed April 17, 2026, 12:26 p.m.
Created at: April 10, 2026, 5:07 a.m.