Triple

T16262388
Position Surface form Disambiguated ID Type / Status
Subject Isaac Bell House E394785 entity
Predicate instanceOf P0 FINISHED
Object Shingle Style building C37184 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Shingle Style building
Context triple: [Isaac Bell House, instanceOf, Shingle Style building]
  • A. Mediterranean Revival building
    A Mediterranean Revival building is an architectural structure characterized by stucco walls, red tile roofs, arches, and ornamental details inspired by Spanish, Italian, and other Mediterranean coastal traditions.
  • B. Arts and Crafts–style building
    An Arts and Crafts–style building is a structure characterized by handcrafted detailing, natural materials, and simple, functional forms that emphasize craftsmanship and harmony with the surrounding environment.
  • C. Greek Revival building
    A Greek Revival building is a structure designed in the early- to mid-19th-century architectural style that emulates classical Greek temples through features like tall columns, pediments, symmetrical facades, and bold, simple moldings.
  • D. Tudor Revival architecture
    Tudor Revival architecture is a late 19th- and early 20th-century style that romantically reinterprets medieval English building traditions through steeply pitched gable roofs, half-timbering, tall narrow windows, and prominent chimneys.
  • E. Romanesque Revival building
    A Romanesque Revival building is a structure designed in a 19th-century historicist style that reinterprets medieval Romanesque architecture through features like round arches, heavy masonry, robust towers, and deeply recessed openings.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f221d8081909b0b2063e7528ba2 completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:04 a.m.