Triple

T16114391
Position Surface form Disambiguated ID Type / Status
Subject Seagrove, North Carolina E390964 entity
Predicate locatedNear P294 FINISHED
Object U.S. Highway 220
U.S. Highway 220 is a major north–south U.S. highway running from Rockingham, North Carolina, to Waverly, New York, serving as an important regional transportation corridor through several Mid-Atlantic states.
E2297415 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Highway 220 | Statement: [Seagrove, North Carolina, locatedNear, U.S. Highway 220]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: U.S. Highway 220
Triple: [Seagrove, North Carolina, locatedNear, U.S. Highway 220]
Generated description
U.S. Highway 220 is a major north–south U.S. highway running from Rockingham, North Carolina, to Waverly, New York, serving as an important regional transportation corridor through several Mid-Atlantic states.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f1a8dd881909f1de6ef78849874 completed April 10, 2026, 4:39 a.m.
NER Named-entity recognition batch_69e20169ce488190bbc814f23a3b7547 completed April 17, 2026, 9:46 a.m.
NED1 Entity disambiguation (via context triple) batch_6a837e5f418c8190a5c4a45a2101baa7 completed Aug. 17, 2026, 9:34 p.m.
NEDg Description generation batch_6a837ed03fac81908608f1560545707d completed Aug. 17, 2026, 9:36 p.m.
NED2 Entity disambiguation (via description) batch_6a837f211d5081909cd564bc92de540e completed Aug. 17, 2026, 9:37 p.m.
Created at: April 10, 2026, 5 a.m.