Triple

T15951991
Position Surface form Disambiguated ID Type / Status
Subject LZB E386839 entity
Predicate instanceOf P0 FINISHED
Object cab signaling system C3559 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cab signaling system
Context triple: [LZB, instanceOf, cab signaling system]
  • A. railway signaling system chosen
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • B. transponder-based toll system
    A transponder-based toll system is an automated electronic toll collection method where vehicles equipped with small radio-frequency devices are detected and charged as they pass through toll points without stopping.
  • C. railway communication system
    A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
  • D. signage system
    A signage system is an organized set of visual elements and standards used to guide, inform, and direct people within physical or digital environments.
  • E. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da882448190a82ea962fe343b79 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:53 a.m.