Triple

T15666436
Position Surface form Disambiguated ID Type / Status
Subject Bellingham–Alaska route E377198 entity
Predicate instanceOf P0 FINISHED
Object long-distance ferry corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: long-distance ferry corridor
Context triple: [Bellingham–Alaska route, instanceOf, long-distance ferry corridor]
  • A. ferry service network
    A ferry service network is a coordinated system of water-based transport routes, vessels, terminals, and schedules that moves passengers and cargo between multiple ports or coastal locations.
  • B. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • D. passenger ferry
    A passenger ferry is a vessel designed to transport people, and sometimes light vehicles or cargo, across bodies of water on regular, short-distance routes.
  • E. ferry service
    A ferry service is a transportation operation that regularly carries passengers, vehicles, and sometimes cargo across bodies of water along fixed routes and schedules.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd2e28481909d4e975bee20872f completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:16 a.m.