Triple
T15636917
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Przedsiębiorstwo Komunikacji Trolejbusowej w Gdyni |
E375968
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | trolleybus operator |
C221
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: trolleybus operator Context triple: [Przedsiębiorstwo Komunikacji Trolejbusowej w Gdyni, instanceOf, trolleybus operator]
-
A.
trolleybus line
A trolleybus line is a designated public transit route served by electrically powered buses that draw current from overhead wires along the roadway.
-
B.
paratransit operator
A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
-
C.
trolleybus stop
A trolleybus stop is a designated roadside area where trolleybuses halt to safely pick up and drop off passengers, typically marked with signage and sometimes shelters or platforms.
-
D.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
E.
mass transit operator
chosen
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd035a48190b73d5579ab73969a |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 4:14 a.m.