Triple

T15529840
Position Surface form Disambiguated ID Type / Status
Subject Sears distribution centers E370183 entity
Predicate instanceOf P0 FINISHED
Object supply chain infrastructure C29604 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: supply chain infrastructure
Context triple: [Sears distribution centers, instanceOf, supply chain infrastructure]
  • A. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • B. logistics network
    A logistics network is an interconnected system of facilities, transportation modes, and information flows designed to efficiently move goods from origin to destination while optimizing cost, time, and service quality.
  • C. Infrastructure for trade
    Infrastructure for trade encompasses the physical, digital, and institutional systems—such as transportation networks, ports, logistics hubs, communication technologies, and regulatory frameworks—that enable the efficient exchange of goods and services across regions and markets.
  • D. storage and distribution system chosen
    A storage and distribution system is an integrated arrangement of facilities, equipment, and processes designed to efficiently receive, store, manage, and deliver goods or resources to their intended destinations.
  • E. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc521a08190921fb50319dddc34 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:05 a.m.