Triple

T15499906
Position Surface form Disambiguated ID Type / Status
Subject Wahnbach E378923 entity
Predicate feeds P9008 FINISHED
Object Wahnbach Dam
Wahnbach Dam is a reservoir and dam in North Rhine-Westphalia, Germany, primarily used for drinking water supply and flood control.
E1279884 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wahnbach Dam | Statement: [Wahnbach, feeds, Wahnbach Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Wahnbach Dam
Context triple: [Wahnbach, feeds, Wahnbach Dam]
  • A. Rappbode Dam
    Rappbode Dam is a large concrete dam in the Harz Mountains of Germany, known for forming the country’s largest drinking water reservoir and for its surrounding recreational area.
  • B. Merwin Dam
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • C. Fengman Dam
    Fengman Dam is a large hydroelectric gravity dam on the Songhua River in Jilin Province, China, known for its significant role in regional power generation and flood control.
  • D. Almanor Dam
    Almanor Dam is a large earthfill hydroelectric dam in Plumas County, California, that impounds the North Fork Feather River to form Lake Almanor.
  • E. Belver Dam
    Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Wahnbach Dam
Triple: [Wahnbach, feeds, Wahnbach Dam]
Generated description
Wahnbach Dam is a reservoir and dam in North Rhine-Westphalia, Germany, primarily used for drinking water supply and flood control.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Wahnbach Dam
Target entity description: Wahnbach Dam is a reservoir and dam in North Rhine-Westphalia, Germany, primarily used for drinking water supply and flood control.
  • A. Rappbode Dam
    Rappbode Dam is a large concrete dam in the Harz Mountains of Germany, known for forming the country’s largest drinking water reservoir and for its surrounding recreational area.
  • B. Merwin Dam
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • C. Fengman Dam
    Fengman Dam is a large hydroelectric gravity dam on the Songhua River in Jilin Province, China, known for its significant role in regional power generation and flood control.
  • D. Almanor Dam
    Almanor Dam is a large earthfill hydroelectric dam in Plumas County, California, that impounds the North Fork Feather River to form Lake Almanor.
  • E. Belver Dam
    Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd53a7c819080f5b9042c4c199e completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e03fcb4e8c81908e4ab463e3ae252b completed April 16, 2026, 1:47 a.m.
NED1 Entity disambiguation (via context triple) batch_6a020a7c08288190bbaabd03dffa0ab8 completed May 11, 2026, 4:57 p.m.
NEDg Description generation batch_6a020b81c0e88190af61ea1a3b89fe8a completed May 11, 2026, 5:01 p.m.
NED2 Entity disambiguation (via description) batch_6a020cc2de908190ae82be94c0d9c1a0 completed May 11, 2026, 5:07 p.m.
Created at: April 10, 2026, 3:54 a.m.