Triple

T15366669
Position Surface form Disambiguated ID Type / Status
Subject Croton Aqueduct system E367432 entity
Predicate instanceOf P0 FINISHED
Object civil engineering infrastructure C3635 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: civil engineering infrastructure
Context triple: [Croton Aqueduct system, instanceOf, civil engineering infrastructure]
  • A. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • B. civil engineering landmark chosen
    A civil engineering landmark is a significant structure or project—such as a bridge, dam, tunnel, or roadway—that exemplifies notable achievement, innovation, or historical importance in the field of civil engineering.
  • C. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • D. civil engineering designation
    A civil engineering designation is a formal title or credential that identifies a professional’s qualification, specialization, and authority to practice within the civil engineering field.
  • E. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a1483788190ad93c2748e8af34b completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:18 a.m.