Triple
T15171171
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brandon Road Lock and Dam |
E362487
|
entity |
| Predicate | partOfSystem |
P840
|
FINISHED |
| Object |
Upper Mississippi River–Illinois Waterway navigation system
The Upper Mississippi River–Illinois Waterway navigation system is a major interconnected network of locks, dams, and channels that enables commercial barge traffic between the upper Midwest and the Gulf of Mexico.
|
E1150236
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Mississippi River–Illinois Waterway navigation system | Statement: [Brandon Road Lock and Dam, partOfSystem, Upper Mississippi River–Illinois Waterway navigation system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Upper Mississippi River–Illinois Waterway navigation system Context triple: [Brandon Road Lock and Dam, partOfSystem, Upper Mississippi River–Illinois Waterway navigation system]
-
A.
Illinois Waterway system
The Illinois Waterway system is a network of rivers, canals, and locks in Illinois that provides a vital navigable link between the Great Lakes and the Mississippi River.
-
B.
Great Lakes waterway
The Great Lakes waterway is a system of natural and artificial channels that enables commercial and recreational navigation between the Great Lakes and the Atlantic Ocean via the Saint Lawrence River.
-
C.
Mississippi River navigation route
The Mississippi River navigation route is a major inland waterway system that supports extensive commercial shipping and transportation through the central United States.
-
D.
McClellan–Kerr Arkansas River Navigation System
The McClellan–Kerr Arkansas River Navigation System is a major inland waterway project that transforms the Arkansas River and connected channels into a navigable route for commercial shipping between the Midwest and the Gulf of Mexico.
-
E.
Ohio River navigation system
The Ohio River navigation system is a network of locks, dams, and channels that enables commercial and recreational navigation along the Ohio River and its connected waterways.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Upper Mississippi River–Illinois Waterway navigation system Triple: [Brandon Road Lock and Dam, partOfSystem, Upper Mississippi River–Illinois Waterway navigation system]
Generated description
The Upper Mississippi River–Illinois Waterway navigation system is a major interconnected network of locks, dams, and channels that enables commercial barge traffic between the upper Midwest and the Gulf of Mexico.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Upper Mississippi River–Illinois Waterway navigation system Target entity description: The Upper Mississippi River–Illinois Waterway navigation system is a major interconnected network of locks, dams, and channels that enables commercial barge traffic between the upper Midwest and the Gulf of Mexico.
-
A.
Illinois Waterway system
The Illinois Waterway system is a network of rivers, canals, and locks in Illinois that provides a vital navigable link between the Great Lakes and the Mississippi River.
-
B.
Great Lakes waterway
The Great Lakes waterway is a system of natural and artificial channels that enables commercial and recreational navigation between the Great Lakes and the Atlantic Ocean via the Saint Lawrence River.
-
C.
Mississippi River navigation route
The Mississippi River navigation route is a major inland waterway system that supports extensive commercial shipping and transportation through the central United States.
-
D.
McClellan–Kerr Arkansas River Navigation System
The McClellan–Kerr Arkansas River Navigation System is a major inland waterway project that transforms the Arkansas River and connected channels into a navigable route for commercial shipping between the Midwest and the Gulf of Mexico.
-
E.
Ohio River navigation system
The Ohio River navigation system is a network of locks, dams, and channels that enables commercial and recreational navigation along the Ohio River and its connected waterways.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a087b7c81908baa94a53dac8d68 |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e0064ec56481909f11fa6e5686f076 |
completed | April 15, 2026, 9:42 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fef88dd1fc8190b6cdabf6c24c2712 |
completed | May 9, 2026, 9:04 a.m. |
| NEDg | Description generation | batch_69fefbea222081908d6e2e1a1d9a0492 |
completed | May 9, 2026, 9:18 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69fefc1e9a088190820953ad6137b183 |
completed | May 9, 2026, 9:19 a.m. |
Created at: April 10, 2026, 3:08 a.m.